References

Project
Category
Location
Stage
Market
 
Realization Project Location Jobs provided Category Detail
2011 Diamo NDS 10, PS 104 – Ammonia stripping, PS 114 – Steam source CZ, Straz pod Ralskem Preparation of the design documentation, guarantee test performance and startup of the units PS 104 – Ammonia stripping, PS 114 – Steam source within the construction of the neutralisation and decontamination station NDS 10 in DIAMO. General delivery. Chemical and Petrochemical Industry
2011 WWTP Hrádkov - 2 600 PE CZ, Hrádkov Delivery and installation of the technological part of Hrádkov WWTP with capacity of 2 600 PE. Water Treatment Facilities
2011 Temelín Nuclear Power Plant – Maintenance of the Logical Unit of Reactor Hall, 2011 CZ, Temelín General contract for work for 2011 – Maintenance of the logical unit of reactor hall. Power Engineering
2010 WWTP Mariánské Lázně, Chebsko CZ, Cheb Intensification and partial reconstruction of the existing wastewater treatment plant in Mariánské Lázně.  Supply of technological equipment, assembly, electrical works for the WWTP intensification. Water Treatment Facilities
2010 Diamo NDS 10, PS 101 - Neutralisation CZ, Straz pod Ralskem Preparation of the design documentation, guarantee test performance and startup of the PS 101 – unit. Neutralisation within the construction of the neutralisation and decontamination station NDS 10 in DIAMO. General delivery. Chemical and Petrochemical Industry
2010 WWTP Bruntál - Screening plant, exchange of bar screen CZ, Bruntál Partial reconstruction of screening plant. Dismantling of one piece of existing bar screen and subsequent assembly of one piece of new mechanical self-cleaning screen including dump mechanism, screw conveyor, new check gate. Water Treatment Facilities
2010 WWTP Cheb, Pump Station Františkovy Lázně CZ, Cheb Intensification and general reconstruction of the existing waste water treatment plant in Cheb, including the new unit construction. Delivery of technological equipment, installation, electrical work for the WWTP intensification. Water Treatment Facilities
2010 Sloup, Šošůvka – WWTP and Sewerage - 2 100 PE CZ, Sloup Reconstruction and intensification of the waste water treatment plant in Sloup. Delivery and installation of the mechanical and technological part, electrical part and Instrumentation, operation start-up. Water Treatment Facilities
2010 WWTP Velké Opatovice - 5 266 PE CZ, Velké Opatovice General delivery of the package 04 – Water service for the steam gas source 880 MW in the Počerady power plant, including the design documentation. Water Treatment Facilities
2010 Počerady Power Plant - OB04 Water Service CZ, Počerady General delivery of the package 04 – Water service for the steam gas source 880 MW in the Počerady power plant, including the design documentation. Power Engineering
2010 Sewerage System Kladno - Švermov CZ, Kladno Construction and equipment provision to sewerage system and pump stations. Water Treatment Facilities
2010 Počerady Power Plant - OB 07 Natural Gas Regulating Station CZ, Počerady General delivery of the 07 Natural gas regulating station 190 000 Nm3/hr package and gas line for the steam gas source 880 MW in the Počerady power plant, including design documentation. Power Engineering
2010 NPP Temelín - Maintenance of the Logical Unit of Reactor Hall, 2010 CZ, Temelín General contract for work for 2010 – Maintenance of the logical unit of reactor hall. Power Engineering
2009 WWTP Nový Bor - 13 400 PE CZ, Nový Bor Intensification of the mechanical and biological wastewater treatment plant. Delivery and installation of the technological part – operating units PS 07,11,12,13,14. Water Treatment Facilities
2009 CPP Prunéřov - OB04 – Water Service CZ, Prunéřov Design documentation, delivery, installation and operation start-up of the technological and building parts of the 04 package – Water service within the "Complex reconstruction of the Prunéřov II power plant“ Project. Power Engineering
2009 Sludge Disposal after the Chemical WWTP CZ, Mělník Complete delivery of the technological, civil and electrical parts of the Project „ Equipment for the waste water treatment and for disposal of the sludge from the control basin and clarifier of the chemical WWTP  I “ on turn-key basis, consisting of the preparation of design documentation, delivery, installation, testing, startup and personnel training. Power Engineering
2009 NPP Dukovany - Replacement of the Piping of Essential Service Water for TG System CZ, Dukovany Preparation of As-built documentation of the piping routes, qualification documentation and proof documentation of the piping of essential technical water for TG system of the nuclear power plant. Power Engineering
2009 WWTP Litvínov – Piping Distribution System CZ, Litvínov Construction of the piping distribution system, sewerage system and waterline connection. Water Treatment Facilities
2009 NPP Temelín - Maintenance of the Logical Unit of Reactor Hall, 2009 CZ, Temelín General contract for work for 2009 – Maintenance of the logical unit of reactor hall. Power Engineering
2009 NPP Dukovany - Mapping of Essential Service Water Piping in the Main Production Unit HVB II – Block 4 CZ, Dukovany Mapping of the actual status of the piping routes and system components of the HVB II main production unit (block 4).  Power Engineering
2009 WWTP Duslo,a.s. Šala – General Reconstruction Slovakia General reconstruction of the wastewater treatment plant for the chemical plant of Duslo, a.s. Šaľa. Delivery on turn-key basis – civil and technological parts, electrical part and instrumentation, preparation of the design documentation. Water Treatment Facilities
2008 Ledvice Power Plant - OB06 – Fuel Gas Service - 660 MW CZ, Ledvice General delivery of the OB 06 “Fuel gas service” for the “New boiler 660 MW in Ledvice power plant” Project. Technological deliveries of the equipment, piping, electrical part, Instrumentation, construction activities for the parts “HP connection”, “Regulation station 50.000 Nm3/h”, “Gas heating”. Power Engineering
2008 Tušimice II Power Plant - OB 8 Miscellaneous Accessories CZ, Tušimice Project “Complex renewal of Tušimice II power plant“, general supply and design development  of the Commercial package OB 8 - Other accessories of the block. Supply of pumps and other equipment. Power Engineering
2008 WWTP Bučovice - 9 860 P.E. CZ, Bučovice Reconstruction and modernization of the Bučovice wastewater treatment plant with capacity of 9 860 PE. General delivery of the technological part, including preparation of the design documentation. Water Treatment Facilities
2008 WWTP Rousínov, 5 500 PE, Vyškovsko Project CZ, Rousínov Reconstruction and modernization of the Rousínov wastewater treatment plant with capacity of 5 500 PE. General delivery of the technological part, including preparation of the design documentation. Water Treatment Facilities
2008 WWTP Slavkov, 10 500 PE, Vyškovsko Project CZ, Slavkov Reconstruction and modernization of the Slavkov wastewater treatment plant with capacity of 10 500 PE. General delivery of the technological part, including preparation of the design documentation. Water Treatment Facilities
2008 Ledvice Power Plant - OB16 – Cooling Water Pump Station - 660 MW CZ, Ledvice General delivery of the OB16 - “Cooling water pump station” for the “New source 660 MW in Ledvice power plant” Project. Delivery and installation of the technological equipment, supply of the construction part. Power Engineering
2008 WWTPs Hodonín, Ratíškovice, Veselí nad Moravou CZ, Hodonín KRÁLOVOPOLSKÁ RIA, a.s. participated in reconstruction and modernization of the wastewater treatment plants in the district of Hodonín (WWTP Hodonín 90 000 PE, WWTP Ratíškovice 4 500 PE, WWTP Veselí nad Moravou 16 000 PE) as a member of the "ARKO TECHNOLOGY -  KRÁLOVOPOLSKÁ RIA" corporation. The Hodonín WWTP project dealt with the reconstruction of the pump stations, mechanical pretreatment unit, the sludge and gas service, electrical part and the plant control system. The Ratíškovice WWTP project dealt with completion and reconstruction of the plant pump station buildings with the storm water tank, mechanical pretreatment unit, the biological stage and blower station, sludge storage, electrical part and the plant control system.  The reconstruction of the WWTP Veselí nad Moravou dealt with the mechanical pretreatment units, biological part, sludge management, electrical part and the plant control system. The reconstruction was aimed to reach the requirements on treated effluent quality in compliance with the water regulation limits and to provide more effective operation of the whole plant. Water Treatment Facilities
2008 CPP Ledvice OB 25 - Water Service - 660 MW CZ, Ledvice General delivery of OB 25 “Water service” for the “New source 660 MW in Ledvice power plant” Project. Delivery and installation of the technological equipment, delivery of the civil part, design documentation. Power Engineering
2008 WWTP Valtice, Břeclavsko Project, Part B, 9 700 PE CZ, Valtice Reconstruction of the wastewater treatment plant in Valtice with the capacity of 9 700 PE, including technological equipment of the pump stations within the urban sewerage system of Valtice. General delivery of the technological part. Water Treatment Facilities
2008 WWTP Břeclav, 50 543 PE, Břeclavsko Project - Part A CZ, Břeclav Reconstruction of the wastewater treatment plant in Břeclav with the capacity of 50 543 PE, including technological equipment of the pump stations within the urban sewerage system of Břeclav. General delivery of the technological part. Water Treatment Facilities
2008 WWTP Lednice, Břeclavsko Project - Part B, 12 000 PE CZ, Lednice Reconstruction of the wastewater treatment plant in Lednice with the capacity of 12 000 PE, including technological equipment of the pump stations within the urban sewerage system of Lednice. General delivery of the technological part. Water Treatment Facilities
2008 WWTP Mikulov, Břeclavsko Project - Part B, 25 000 PE CZ, Mikulov Reconstruction of the wastewater treatment plant in Mikulov with the capacity of 24 850 PE. General delivery of the technological part. Water Treatment Facilities
2008 WWTP Podivín, Břeclavsko Project, Part A, 5 250 PE CZ, Podivin Reconstruction of the wastewater treatment plant in Podivín with the capacity of 5 250 PE. General delivery of the technological part. Water Treatment Facilities
2008 Dukovany Nuclear Power Plant – Reconstruction of Air Filtration System CZ, Dukovany Complete replacement of the primary zone air-handling system filters, preparation of the design of modernization of the LP regenerators´ start-up and shutdown steam lines control system. General delivery. Power Engineering
2008 Dukovany NPP – Prevention of Complete Loss of Coolant in the Event of LOCA CZ, Dukovany Delivery, installation and design documentation for the “Prevention of total loss of coolant in the event of LOCA" Project. The Project included the air ducts completing with the siphons and closed inlets, the emergency steam exhaust sump completing with lockable sluice outlet and the sealing of the sluice shaft piping. Power Engineering
2008 Mochovce Nuclear Power Plant – Completion of Blocks 3 and 4 Slovakia Preparation of the Detail Design documentation, proof and qualification documentation, provision of material deliveries for the primary circuit auxiliary systems, radioactive liquids treatment plant, emergency systems, radioactive waste management. Power Engineering
2008 Dukovany NPP – Control Valves Installation in NTO4, NTO5 External Steam Systems CZ, Dukovany Preparation of the documentation and consequent execution of the "Control valves installation in external steam lines to NTO4 and NTO5” Project for Dukovany NPP in form of the general delivery. Modifications of the equipment, structures and systems, external steam lines of the low pressure heaters (NTO) 4 and 5. Power Engineering
2008 Diamo ZML, PS 01 – Mother Liquor Treatment CZ, Straz pod Ralskem General delivery of the mechanical and technological part of the "Mother liquor treatment plant ", PS 01 - Neutralisation. Preparation of the design documentation, supply and installation, including the start-up and guarantee test. Chemical and Petrochemical Industry
2008 WWTP Hrušky, 2 600 PE, Vyškovsko Project CZ, Hrušky Reconstruction and modernization of the Hrušky wastewater treatment plant with capacity of 2 600 PE. General delivery of the technological part, including preparation of the design documentation. Water Treatment Facilities
2008 WWTP Hustopeče, 9 900 PE, Břeclavsko Project, Part C CZ, Hustopeče Reconstruction and intensification of the Hustopeče wastewater treatment plant with the capacity of 9900 PE. General delivery of the technological part, electrical equipment and Instrumentation. Water Treatment Facilities
2008 WWTP Pohořelice, 6 000 PE, Břeclavsko Project, Part C CZ, Pohořelice Reconstruction and intensification of the Pohořelice wastewater treatment plant (6000 PE) – delivery and installation of the technological part, electrical equipment and Instrumentation. Water Treatment Facilities
2008 WWTP Velké Pavlovice, 5 400 PE, Břeclavsko Project, Part C CZ, Velké Pavlovice Intensification of the Velké Pavlovice wastewater treatment plant (5400 PE). General delivery of the technological part, electrical equipment and Instrumentation. Water Treatment Facilities
2008 WWTP Kobylí, 2 420 PE, Břeclavsko Project, Part C CZ, Kobylí Construction of the Kobylí wastewater treatment plant (5400 PE). General delivery of the technological part, electrical equipment and Instrumentation. Water Treatment Facilities
2007 RCTR Nelahozeves - storage tank CZ, Nelahozeves Delivery of the storage tank, capacity of 125 000 m3, assembly works. Chemical and Petrochemical Industry
2007 NPP Dukovany - Seismic resistance of essential service water pipelines CZ, Dukovany Preparation of calculations and analyses for improvement of the piping seismic resistance, preparation of the design documentation. Power Engineering
2007 Temelín NPP – Optimizing of Equipment Operation Checks CZ, Temelín Optimizing of equipment operation checks – extension and change of the operation checks interval from 4 to 6 years. Preparation of the equipment Vendor prints. Power Engineering
2007 CPP Tušimice II - OB 4 - Water management CZ, Tušimice “Renewal of Tušimice II power plant“ Project. Delivery of technological equipment for the thickening and sedimentation tanks and dredging station, including preparation of the design documentation. Power Engineering
2007 Air Base Náměšť nad Oslavou – Construction of Aviation Fuel Storage CZ, Náměšť nad Oslavou Delivery and installation of the mechanical and technological part of the construction of aviation fuel storage, including the electrical part and Instrumentation. Preparation of the Detail Design documentation and operation start-up. Chemical and Petrochemical Industry
2007 WWTP Košice, 391 700 PE Словакия Reconstruction and modernization of the Košice WWTP - 391 700 PE, preparation of the design documentation. Water Treatment Facilities