Temelín NPP – Optimizing of Equipment Operation Checks

KRÁLOVOPOLSKÁ RIA, a.s. executed the Project aimed to the optimization of the equipment operation checks interval within the blocks 1 and 2 of the Temelín nuclear power plant. The assessment and change of the operation checks interval was performed for the equipment, the operation checks of which directly affect the length of the NPP shut-down period.

 
Project:
Temelín NPP – Optimizing of equipment operation checks
Project commencement:
2007
Locality:
CZ, Temelín
Investor:
ŠKODA JS, a.s.
Scope of Project:
Optimizing of equipment operation checks – extension and change of the operation checks interval from 4 to 6 years. Preparation of the equipment Vendor prints.