Temelín Nuclear Power Plant – Connection of Nitrogen Discharge Line from Hydro Accumulator (HDA) to the Air-handling System

KRÁLOVOPOLSKÁ RIA, a.s. executed for ČEZ, a.s. the Project consisting of the preparation of design documentation of the new lines for depressurisation and discharge of nitrogen from the hydro accumulator and the delivery and installation during the shutdown period of the nuclear power plant blocks 1 and 2. The objective of such a reconstruction was to enable rapid and safe nitrogen discharge to the air-handling system for the purpose of HDA repair and inspection.

 
Project:
B584 – Additional connection of nitrogen discharge line from HDA to the air-handling system
Project commencement:
8/2011
Locality:
CZ, Temelín
Investor:
ČEZ, a.s., Duhová 2/1444, 140 53 Praha 4
Scope of Project:
Preparation of the complete design documentation of mechanical part, delivery and installation of the new lines for nitrogen discharge from the hydro accumulator (HDA) to the existing technology of the nuclear power plant blocks 1 and 2.