WWTP Hustopeče, 9 900 PE, Břeclavsko Project, Part C

KRÁLOVOPOLSKÁ RIA, a.s. executed the reconstruction and intensification of the mechanical and biological wastewater treatment plant for the town of Hustopeče within the Břeclavsko Project – reconstruction and construction of the water service infrastructure within the Dyje river basin. The Project was executed during 2007 - 2009 and in 2010, after the trial operation, the WWTP was put into the permanent operation. The modernized plant meets the limits required for the treated effluent quality in compliance with the applicable both Czech national and European standards and the water regulation limits for Hustopeče WWTP.

The WWTP construction was divided into 5 integral parts dealing with the existing equipment overhaul, the activation intensification through aeration system replacement, the new technological equipment installation into the existing buildings for the purpose of the WWTP capacity increase.  The collected water receiving unit was built up and provided with technological equipment.

 
Project:
Břeclavsko - reconstruction and construction of the water service infrastructure within the Dyje river basin "Břeclavsko Project - part C"- WWTP Hustopeče
Project commencement:
2008
Locality:
CZ, Hustopeče
Investor:
Vodovody a kanalizace Břeclav, a.s.
Scope of Project:
Reconstruction and intensification of the Hustopeče wastewater treatment plant with the capacity of 9900 PE. General delivery of the technological part, electrical equipment and Instrumentation.