WWTP Pohořelice, 6 000 PE, Břeclavsko Project, Part C

KRÁLOVOPOLSKÁ RIA, a.s. executed the reconstruction and intensification of the mechanical and biological wastewater treatment plant for the town of Pohořelice within the Břeclavsko Project – reconstruction and construction of the water service infrastructure within the Dyje river basin. The Project was executed during 2007 - 2009 and in 2010, after the test run, the WWTP was put into the permanent operation. The plant meets the limits required for the treated effluent quality in compliance with the applicable both Czech national and European standards and the water regulation limits for Pohořelice WWTP.

The WWTP consists of the rough pretreatment unit, pumping stations, mechanical pretreatment unit, two units of the biological stage, the sludge service and sludge hygienisation unit. The waste water source consists of the municipal sphere and industrial facilities of the town and connected Cvrčovice municipality. Recipient of the treated effluent is Jihlava river.

 
Project:
WWTP Pohořelice 6 000 PE, Břeclavsko project, part C
Project commencement:
2008
Locality:
CZ, Pohořelice
Investor:
Scope of Project:
Reconstruction and intensification of the Pohořelice wastewater treatment plant (6000 PE) – delivery and installation of the technological part, electrical equipment and Instrumentation.