WWTP Slavkov, 10 500 PE, Vyškovsko Project

KRÁLOVOPOLSKÁ RIA, a.s., participated in reconstruction of the Slavkov waste water treatment plant within the "Reconstruction and construction of the water service infrastructure of Vyškov district" Project, and executed this Project as a general contractor of the technological part, together with the company D.I.S. s.r.o. within the "Sdružení Vyškov" association.

The reconstruction of the mechanical and biological wastewater treatment plant in Slavkov was during 2007-2008 and in December 2009, after the trial operation, the WWTP was put into permanent operation. The reconstructed plant meets the requirements on treated effluent quality in compliance with both Czech national and European standards and the water regulation limits for Slavkov WWTP.

 
Project:
Reconstruction and construction of the water service infrastructure of Vyškov district – Slavkov WWTP
Project commencement:
7/2008
Locality:
CZ, Slavkov
Investor:
Vodovody a kanalizace Vyškov, a.s.
Scope of Project:
Reconstruction and modernization of the Slavkov wastewater treatment plant with capacity of 10 500 PE. General delivery of the technological part, including preparation of the design documentation.