WWTP Velké Opatovice - 5 266 PE

KRÁLOVOPOLSKÁ RIA, a.s. executed for the town of Velké Opatovice the complete reconstruction of the mechanical and biological wastewater treatment plant. The Project was executed during 2010-2012 and meets the quality requirements on effluent discharge in compliance with the applicable standards and water regulation limits for the Velké Opatovice WWTP.  The wastewater treatment plant consists of the pump station, storm water tank, mechanical pretreatment unit with integrated racks and sand trap, circulating low-rate activation tank with selector and circular settling tanks. The sludge service consists of excess sludge thickening and dewatering unit and the tanks for sludge stabilisation on the basis of oxytherm sludge system with pure oxygen application.

The treated water effluent recipient is the local Jevíčka stream, a confluent of the Morava river.

 
Project:
Reconstruction and intensification of the WWTP Velké Opatovice
Project commencement:
7/2010
Locality:
CZ, Velké Opatovice
Investor:
Město Velké Opatovice
Scope of Project:
General delivery of the package 04 – Water service for the steam gas source 880 MW in the Počerady power plant, including the design documentation.