Diamo NDS 10, PS 101 - Neutralisation

KRÁLOVOPOLSKÁ RIA, a.s. executed for the company Diamo, s.p. the "PS 101 - Neutralisation" Project. This Project was a part of the construction of the Neutralisation and decontamination station NDS 10 of the company Diamo, branch plant (OZ) Mining and processing of uranium Stráž pod Ralskem.

Construction of the neutralisation and decontamination station consisted in the construction of a complex of 16 units fitted with technology for remediation of the impacts of chemical uranium mining.
The NDS 10 station technologically links up the phase of mother liquors processing with technology of their neutralisation and alkalization with calcium hydroxide, with the consequent ammonia removal by means of water steam.

In “PS 101 Neutralisation” the residual technological solutions are neutralised with 20% calcium hydroxide.

Within the 9th year of the competition  PROJECT OF THE YEAR 2013 IN LIBEREC REGION this Project was awarded the 3rd place and a Special award in the category "Cena Doc. Ing. arch. Karla Hubáčka Dr. h. c". This Project gives the future generation a chance of remediation of the impacts of chemical uranium mining in Stráž pod Ralskem and revitalization of the affected area.

Otevře interní odkaz v aktuálním okněVirtual tour

 
Projekt:
Diamo Stráž pod Ralskem – Neutralisation and decontamination station NDS 10, PS 101 - Neutralisation
Zahájení realizace:
10/2010
Lokalita:
CZ, Straz pod Ralskem
Investor:
DIAMO, s.p., o.z. Těžba a úprava uranu
Předmět zakázky:
Preparation of the design documentation, guarantee test performance and startup of the PS 101 – unit. Neutralisation within the construction of the neutralisation and decontamination station NDS 10 in DIAMO. General delivery.