Ledvice Power Plant - OB06 – Fuel Gas Service - 660 MW

KRÁLOVOPOLSKÁ RIA a.s. executed within the "New boiler 660 MW in Ledvice power plant" Project the delivery of the "OB 06 – Fuel gas service".

This project dealt with the new high pressure natural gas connection piping DN 300 for feeding of the ignition and stabilisation burners of the new 660 MW boiler and feeding of the existing block 4 of the Ledvice power plant.

Ledvice power plant is a thermal power plant of the ČEZ company. In October 2009 the construction of the new power source with the capacity of 660 MW was commenced. This is the first supercritical and highly efficient boiler in the Czech Republic and in Central Europe. The best available technologies were applied for the boiler construction. This source efficiency amounts to 42.5% and emissions are lower by 20% in comparison with the standard coal-fired power plants.

 
Projekt:
New boiler 660 MW in Ledvice power plant - OB06 – Fuel gas service
Zahájení realizace:
11/2008
Lokalita:
CZ, Ledvice
Investor:
ČEZ a.s., Duhová 2/ 1444, 140 53 Praha 4
Předmět zakázky:
General delivery of the OB 06 “Fuel gas service” for the “New boiler 660 MW in Ledvice power plant” Project. Technological deliveries of the equipment, piping, electrical part, Instrumentation, construction activities for the parts “HP connection”, “Regulation station 50.000 Nm3/h”, “Gas heating”.