Mochovce Nuclear Power Plant – Completion of Blocks 3 and 4

KRÁLOVOPOLSKÁ RIA, a.s. participated, as one of the main contractors, in the execution of the „Completion of blocks 3 and 4 of the Mochovce nuclear power plant " Project. Slovenské elektrárne, a.s. selected this company on the basis of its successful participation in the preceding completion of the blocks 1 and 2.

The company Slovenské elektrárne, a. s. (majority-owned by the Italian ENEL group) has invested about 4.63 billion euros to the Project completion. This is the largest private investment in the history of the Slovak Republic. Energy produced within the blocks 3 and 4 with the VVER 440/V 213 pressurized-water reactors with installed capacity of 440 MW will cover approximately one quarter of the Slovak power consumption. Together with blocks 1 and 2 the power plant will totally cover 45 % of power consumption in the Slovak Republic.

 
Projekt:
Completion of EMO34
Zahájení realizace:
2008
Lokalita:
Slovakia
Investor:
Slovenské elektrárne, a. s., Mlynské nivy 47, 821 09 Bratislava
Předmět zakázky:
Preparation of the Detail Design documentation, proof and qualification documentation, provision of material deliveries for the primary circuit auxiliary systems, radioactive liquids treatment plant, emergency systems, radioactive waste management.